Bio-Cremation (Alkaline Hydrolysis) Sewer Use Advice

Provided analysis of impacts of alkaline hydrolysis waste on local wastewater collection and treatment system and recommendations on wastewater pre-treatment, discharge agreement, and treatment plant management.

City of Markham Pump Station Condition Assessment

Undertook field investigations of four pumping stations and collected assessments by a mobile device and compiled a photo log for storage in a database. Prepared reports identifying the condition, life-cycle, and expected replacement cost of stations.

Brittany Drive Pump Station Reconstruction

Provided functional and detailed designs for a new pump station containing three pumps. Wrote specifications, constructability report, and temporary water service memorandum.

Richmond Pump Station and Reservoir Construction

Participated in communal water system construction by creating inventory, and finalizing deficiency list. Inspected testing and construction progress.

Britannia Watermain Repair

Inspected carbon fiber pipe relining, and prepared progress payment.

Carlsbad Watermain Construction

Inspected 2-km horizontal directional drilling for watermain installation.

East End Culverts Replacement

Inspected culverts installation.